The table below shows the data relationship between PMI data elements/fields (target) and corresponding source data elements/fields (source).

You will find the transformation/load rules meant to explain any programmatic manipulation and calculation applied in the adapter to get the desired data format and/or result in the PMI staging table where such have been applicable.

An example of the source file data, format and structure is also attached below the table.

This table will be updated whenever the source file or the adapter in question are changed throughout the interface life-cycle.

# PMI data element (target) Description Mandatory / Optional Data transformation/load rules PPE data element (source) Comment
1 Property ID ID of the property (hotel, restaurant) Mandatory Directly mapped to source equivalent Not in use
2 Property Name Name of the property (hotel, restaurant) Mandatory Directly mapped to source equivalent Property Name
3 Department ID ID of the department within the property Mandatory Directly mapped to source equivalent Not in use
4 Department Name Name of the department within the property Mandatory Directly mapped to source equivalent Department Name
5 Date Working date (timesheet) Mandatory Directly mapped to source equivalent Date
6 TimeCategory ID ID of the time category Mandatory Directly mapped to source equivalent Not in use / AZ, eventuelle über Weekly
7 TimeCategory Name Name of the time category (e.g. Fixed Salary, Absence) Mandatory Directly mapped to source equivalent Type Type This is needed to separate productive and non-productive hours
8 JobCategory ID ID of the job category Optional Directly mapped to source equivalent Not in use
9 JobCategory Name Name of the job category (e.g. Servers, Managers) Optional Directly mapped to source equivalent Cost Center Name
10 Staff ID ID of the staff (employee) Mandatory Directly mapped to source equivalent Staff ID Not presented at staff level, but at job category and date level
11 Hours Number of hours (on the timesheet) Mandatory Exists in minutes. Transformation rule: minutes divided by 60 to get number of hours in PMI Hours
12 Approved If the hours are approved or not Mandatory Approved and to-be-approved hours exist. Loading rule: only import approved hours Approved All hours included in the file are approved in PPE