A staffing review compares planned hours with expected workload and the relevant staffing reference, then checks whether operational requirements explain the difference. Review daily coverage as well as the period total.

Establish comparable figures

Select the department and dates. Use the applicable demand outlook, planned hours and the labelled SMART or other staffing reference for those dates. Keep actual hours, scheduled hours, remaining planned hours and forecast hours distinct.

Check that the necessary demand drivers and schedule data are available. A monthly variance alone cannot identify which days to change, and a period outside the available scheduling horizon cannot support a detailed schedule recommendation.

Identify the staffing reference and hour basis

SMART Forecast distributes the monthly hours or productivity forecast across days, using the configured cost drivers and staffing patterns. The Staffing Guide provides a separate, model-based recommendation from expected activity and historical patterns. They can differ because they are built differently; neither is automatically a minimum safe service level.

Both references concern productive hours. Compare them with the corresponding productive hours in the plan, and review nonproductive hours such as training separately. Keep configured SMART limits, Staffing Guide ranges and operational minimum coverage distinct. Use the report label to establish which reference and range you are looking at.

See the existing SMART forecast explanation and Staffing Guide explanation for their calculation and settings. This review uses those definitions rather than replacing them.

Examine the days needing attention

Illustrative example: Tuesday has 120 planned productive hours against a staffing reference of 100 hours. The 20-hour difference is a reason to review the plan. It is not, on its own, proof that 20 hours can be removed.

Check minimum coverage, fixed duties, opening hours, workload peaks, events, training and the skills needed for service. Hours below the reference deserve review too. A reduction that leaves insufficient capacity during a busy service can create a different operational problem.

Consider additional coverage and redistribution

Illustrative situation: Friday has 80 planned productive hours against a 100-hour reference. A service-period review confirms that a booking increase requires 12 additional hours of appropriately skilled coverage. The 20-hour reference gap alone did not establish that requirement; the demand and coverage review did.

The department head and scheduler first check whether 6 hours can be moved from a quieter service without leaving that service short, then consider 6 additional paid hours if permitted. Check skills, availability, breaks, employment rules and approval requirements before changing the schedule. Recheck the plan before service and compare actual workload, hours and available service outcomes afterward.

Moving hours can improve coverage without reducing total payroll. Additional hours may be the appropriate choice when they support the service or revenue objective. PIA can help explain supplied evidence, but this article does not imply that every deployment can access employee availability or change a schedule.

Translate a supported adjustment into impact

If a review identifies 8 avoidable paid hours and the applicable avoidable cost is 250 currency units per hour, the estimated labour-cost effect is 2,000 currency units. This is an illustrative calculation, conditional on those costs actually being avoided.

Reducing allocated hours for fixed-salary employees may release capacity without reducing payroll. Do not label all hours below a reference as savings, or treat a labour-cost estimate as a complete GOP forecast.

Review closure and reopening duties

For a closed or partly closed period, confirm the actual operating dates, available capacity and expected demand. A reporting period lock controls editing and does not establish that a property is closed.

Review staffing separately from guest demand. Maintenance, security, cleaning, training and reopening preparation may still require hours when room nights are zero. Check the relevant drivers, staffing reference, fixed duties and planned hour categories before proposing a reduction. Verify both the closure and reopening dates after an authorised change.

Distinguish a planning rate from actual hourly cost

A configured rate supports planning; it does not by itself establish the actual average cost. Reconcile departmental labour costs, including the intended employer/social charges, with matching hours for the same period. Identify whether the rate is per paid or productive hour and avoid adding costs already included in the source total.

Use the hourly rates guidance with the controller or payroll owner. Only use salary information the user is permitted to access. Even a reconciled average rate is not necessarily the cost avoided by removing one scheduled hour.

Which weekdays repeatedly need a staffing review?

Compare several representative weeks using the same department, workload driver, hour basis and staffing reference. Separate scheduled hours and future demand from actual hours and completed workload. Review holidays, closures, events and unusual operating hours separately so they do not masquerade as a normal weekday pattern.

For each weekday, record the number of observations, workload, relevant hours and the difference from the applicable reference. For workload per hour, divide total workload by total matching hours rather than taking an unweighted average of daily productivity ratios.

A repeated gap above the reference is a reason to inspect coverage, fixed duties and demand timing. A gap below it is a reason to check whether the work and service can be delivered. Neither gap alone establishes overstaffing, understaffing or a safe adjustment. Where service evidence is unavailable, say what still needs checking.

Are non-productive hours driving labour costs?

Separate productive hours from paid non-productive categories such as training or leave, using the report’s definitions. Reconcile their hours and associated costs for the same period and department. Check whether leave costs were accrued earlier or are already included in a loaded rate, so they are not counted twice.

Review both the cost amount and its share of total labour cost against a suitable plan or comparison. An increased share can result from productive hours falling rather than non-productive hours increasing. Hours alone do not establish the cost effect when rates, salary commitments or accrual treatment differ.

For a covers-per-productive-hour measure, separately classified non-productive hours are outside that denominator; they may still affect total labour cost and measures based on paid hours. Do not improve one ratio by relabelling necessary work or removing required training or leave. Assess materiality and operational purpose before proposing an action.

What should change next month to reach the productivity target?

Confirm the target measure, workload driver and available forecast for next month. Identify whether the current gap reflects volume, hours, data quality, work organisation or an unsupported target assumption. Choose actions addressing the supported explanation.

Illustrative calculation: if the agreed target is 10 covers per productive hour and expected workload is 7,000 covers, the target implies 700 productive hours. A plan of 750 has a 50-hour difference to review. That calculation does not establish that 50 hours can be removed; check daily demand, skills, fixed duties and minimum coverage first. Paid non-productive hours must be considered separately on the defined cost basis.

Agree a feasible action, an owner and a review date before the month begins. Review the relevant daily or weekly workload, hours, productivity and available service indicators during the month. If the target cannot be met within the supported operating requirements, escalate the assumption for review rather than claiming a numerical reduction will solve the problem.

Agree an action and a follow-up

An HOD can propose changes to the affected days for review. A GM can check cross-department coverage and service implications. Confirm authority, period locks and scheduling constraints before saving changes through the normal workflow.

After an agreed change, review workload, productivity and available service indicators. SMART is a planning reference; it does not prove that guest experience or employee workload is acceptable.

Ask PIA a focused question

“Which days next week differ most from the staffing reference? Explain the demand and hour evidence, then suggest what I should verify before adjusting the plan.”

For a scenario such as a 10% demand change, specify what changes and what remains fixed. Staffing need not change proportionally: fixed duties, minimum coverage, demand mix and productivity assumptions affect the result.